Tower Crane Dismantling Method Statement //free\\ [FAST]

Sling the operator’s cabin and disconnect all remaining terminal wiring.

: Identification of hazards such as falls from height, falling objects, and mechanical failure. Communication Plan

Position the mobile assist crane at the designated, engineered lifting pad.

Ensure outrigger mats or steel plates are positioned correctly. 6. Step-by-Step Dismantling Sequence tower crane dismantling method statement

Loosen and remove the high-tensile structural bolts connecting the slewing assembly to the top mast section.

Establish a strict exclusion zone at ground level using physical barricades and warning signs.

Rotate the tower crane jib to the designated dismantling radius. Sling the operator’s cabin and disconnect all remaining

For practical use, a tower crane dismantling method statement should include this table format on the first page:

The scope of work includes the dismantling of a [insert type/model] tower crane, located at [insert location], to a height of [insert height] meters. The crane has a lifting capacity of [insert capacity] tons and consists of [insert number] sections.

Unfasten the high-tensile bolts connecting the slewing assembly to the top mast section. Ensure outrigger mats or steel plates are positioned

The complete dismantling of a specific tower crane model (e.g., a hammerhead or luffing jib crane), including the removal of the jib, counter-jib, tower mast sections, slewing unit, and base/foundation plates.

The crane would have climbed down step-by-step prior to structural unpinning by using its hydraulic rams to lower itself and removing mast sections internally. If using the mobile crane directly: Attach the lift rigging to the top mast section.

A single, designated must be in charge. This person supervises the entire process directly and cannot perform any other role during the dismantling procedure. The team itself must be composed of experienced professionals. In many jurisdictions, the dismantling must be carried out by a specialized team that has obtained the proper qualifications and certifications from construction authorities. The work crew should include a competent crane operator, qualified riggers, and signal persons who are familiar with the specific crane model and the dismantling plan.

Responsible for planning the lift and overseeing the lifting plan.

Prepare auxiliary power lines if temporary slewing control is required by the manufacturer. Step 3: Removal of Counter-Weights